Current and other Related Studies

Several other studies are being carried out at the same time as the hcmc line 2 study. In many cases there is a requirement for the hcmc2 consultant to coordinate / liaise with the consultants who are working on the other studies.

When you check out material from other studies you should remember that

  • the chainages which they quote are different to the chainages which will be developed in this study, and
  • the coordinates system which their plans and drawings are based on are probably different to the coordinates system which this study will use
Year Company Topic Details
on-going Saigon Urban Development Company Studies for the depot for the proposed line 2 Affects the hcmc2 work being carried out by Pöyry and by ILF
drawings and reports related to the line 1 studies and planning
on-going Hiep Hoa – ACCCO – Quang Huy Consortium Survey and design for administration building and auxiliary works at Tham Luong Depot survey and design for administration building and auxiliary works at Tham Luong Depot of the Project “Ho Chi Minh City Metro Line 2 Construction, Ben Thanh – Tham Luong Route”