Previous Studies

Many studies have been carried out over the last 15 years or so into the development of a metro system for Ho Chi Minh City (hcmc), and in particular into the development of the proposed line 2. The document management system includes an extensive list of these studies. The following list presents the most important ones.

When you check out material from other studies you should remember that

  • the chainages which they quote are different to the chainages which will be developed in this study, and
  • the coordinates system which their plans and drawings are based on are probably different to the coordinates system which this study will use
Year Company Topic Details
2011 TRICC Feasibility Study- hcmc MRT project: Metro Line No.2: Ben Thanh – Tham Luong The most important of the previous studies, and the one which produced the approved basic design.
2011 MVA TA-7343 Ho Chi Minh City MRT Line 2 Project, MRT Master Plan Report The purpose of TA7343-VIE was to update the HCMC MRT Line 2 studies, in order to finalise the Feasibility Study (FS) and to complete the due diligence activities.
2010 BfV Büro für Verkehrsplanung HCMC 21 – Towards a world-class transit oriented metropolis

2009 MVA ADB-TA 4862 hcmc urban mass transit line 2 project Feasibility study undertaken during 2007-2008. The TA was accepted and approved by ADB in 2009.
2009 ‘Decision No. 35’ approved the adjustments to Viet Nam’s transport development strategy up to 2020 with a vision to 2030
2008 ADB Public Private Infrastructure Advisory Facility TA 4862-VIE :P reparing the Ho Chi MinhCity Metro Rail System – PPIAF Study, Completion Report (August 2008)
2008 HCMC Master Plan Ridership and Revenue Forecast Study, Final Report, January 2008
2006 TDSI HCMC Transport Development Planning to 2020 (MoT / TEDI(S) / TDSI, 2006)
2006 Nikken Sekkei Study on the Adjustment of Ho Chi Minh City Master Plan up to 2025 Final report published April 2007
2004 HOUTRANS The Study On Urban Transport Master Plan And Feasibility Study In Ho Chi Minh Metropolitan Area
2003 Tewet Pre-Feasibility Studies of MRT Lines 2 and 3 (Tewet, 2003 & 2005)

 

Leave a Reply